While some organisations have their own contractors and choose to self-install, we highly recommend using one of WooWoo’s certified installation companies to assemble and install the toilet units. With many years of experience, they are the most qualified to maximise efficiency of the system through correct placement, avoiding any pitfalls during build, and delivering the product at its best.
The installation process usually takes two days and here are the most important aspects to note when choosing a location for your Kazuba toilet.
The toilet and cabin kit arrives flat-packed at your site. An excavation is dug using a digger.
The tank and chimney system is assembled and installed into the ground.
Once the tank is in situ, the cabin structure and exterior cladding is assembled.
A concrete slab is poured inside the cabin to stabilise the structure and obtain a smooth floor.
Excess soil is evacuated and the surrounding area is restored to normal.
Find a location that catches the sun about 75% of the day
Think about shadows cast in the winter time
Find a location where there’s plenty of wind, unsheltered by trees or large buildings
Face the chimney south
We recommend choosing a location which could potentially be accessed by a small vacuum truck in case the Kazuba system requires pumping out one day.
Not sure which toilet is right for you, need a quote or want to know a little more information?
Help us advise you by telling us a little about your situation - or even better, give us a call to discuss options!
Alternatively, you can write us an email at:
or give us a call on:
Sign up to our newsletter to receive WooWoo news and offers
Like us on Facebook
Suppliers